HARRIS REBAR DESIGN-BUILD OF NEW 35,000 FT2 REBAR HANDLING FACILITY

  • Design-Build of a 35,000 ft2 rebar handling facility
  • Complete turnkey project from development/building permit, engaging all consultants through final occupancy
  • Site required extensive over-excavation to remove approximately 7,500 m3 of unsuitable material and import the same of structural gravel
  • Completed with own forces all site excavation and backfill, utilities and concrete foundations
  • Pre-engineered metal building and overhead crane was supplied by client with erection by IDL Subcontractor
Client Company:Harris Rebar Ltd.IDL's Role:Design-Build
General Contractor
Location:Prince George, BCStart date:April 2012
project status:Completeend date:September 2012