JV Driver Steel Detailing and Fabrication Facility

Design/Build of a state of the art steel fabrication facility consisting of 2 shops, as well as an attached three floor office building. The main fabrication shop is 14,700 ft2 attached to 12,900 ft2 of office space. The secondary detailing shop is attached to the main shop and offices via catwalk and measures 6,633 ft2. This will be the most technologically advanced facility of itís kind in all of North America.
Client Company:JV Driver CorporationIDL's Role:
Location:Nisku, ABStart date:May 2008
project status:Completedend date:February 2009