JV Driver Tenant Improvement

60,000 ft2 tenant improvement to an existing 100,000 ft2 two-storey tilt up construction building. Construction was fast tracked with work starting on site with drawings only at 30% completion. Working with the client and the consultant, we expedited the drawings and specification to 100% IFC in 1 month while construction was underway. Construction timeline was set at a very aggressive 5 months. This building houses 300 employees.
Client Company:JV Driver Corporation
Location:Leduc, ABStart date:
project status:Completeend date:January 2009