Atco Two Rivers Site C Waste Water
Construct of new waste water treatment ponds and gravity piping to new disposal field to accommodate the 2200 worker camp for BC Hydro’s Site C Dam Project.
Work included construction of 3 new waste water cells with HDPE liner, blower building for aeration of the 3 cells, 1,500 lm of 140mm DR 26 HDPE gravity pipe to septic field, a 42,000m2 septic field with solar powered dosing valves to 8 dosing zones via laterals. Works included graveled roadways, constructed storm pond and 550lm gravity storm pipe to ravine from pond.
Client Company:
Atco Structures and Logistics Ltd.
Location:
Fort St. John, BC
Completion Date:
July 2016