Careers Call Us: 1-250-649-0561

BC Hydro – Site C Warehouse

Fast Track Design and Construction of a 35,000ft2 mixed use storage and minor assembly warehouse for BC Hydro to accommodate their major equipment suppliers for the construction of the new Site C Dam. A Pre-Engineered Metal Building Warehouse on a 330,000 ft2 site. Mechanical system consists of interlocked exhaust and 20,000 CFM heat recovery system with double 52kW air curtains at each overhead door locations and 8- 36 kW gas fired unit heaters.

Client Company:

BC Hydro

Location:

Fort St. John, BC

Completion Date:

February 2019

Your Vision + Our Team = SUCCESS

Contact us