JV Driver Corporation – CNRL Hydrogen Plant Site Work
Bulk excavation of 33,000 yd3 for Hydrogen Plant. Excavation and backfill for 470 m of 16” diameter HDPE fire line, and excavation for underground utilities.
Client Company:
JV Driver Corporation (JV Driver)
Location:
Fort McMurray, AB
Completion Date:
May 2006